Q
Our Competitive Edge

Why Qube Compute

Five pillars that make us the best AI infrastructure choice in the region

01

Data Center Mastery

Tier III TIA-942 certified. 3×5MW Jichai gas generators, 2×8MW ABHM Shuangliang absorption chillers, CDU liquid cooling, 800VDC power. PUE 1.10 — world-class efficiency.

Tier III
TIA-942
1.10
PUE
8 MW
Total Power
800VDC
Power System
02

Energy Advantage

Gas-powered generation at $0.048/kWh — 3x cheaper than Western providers. Waste heat from generators drives absorption chillers, creating a nearly closed-loop cooling system.

Energy Cost Comparison ($/kWh)

Qube Compute (Almaty)$0.048
Nebius (Helsinki)$0.08
AWS (Virginia)$0.12
Azure (West EU)$0.15
CoreWeave (USA)$0.18
03

Sharia Compliance

AFSA/AIFC certified Mudaraba structure. No debt (riba), no derivatives (gharar). Access to $4.5 trillion in Islamic sovereign wealth funds. The only halal GPU cloud globally.

$4.5T
Islamic Finance Assets
$925B
PIF
$993B
ADIA
$475B
QIA
04

SEZ Tax Benefits

0% corporate tax, VAT, and personal income tax until 2029. Government investment contract with MIIR guarantees tariffs and benefits for 10 years.

0%
Corporate Tax
0%
VAT
0%
Income Tax
2029
Until
Annual tax savings: ~$62M/year
05

Technology Roadmap

Rubin R100 NVL72 (2026) → Rubin Ultra NVL576 (2027) → Feynman F100 (2028+). Infrastructure designed with headroom: 800VDC, CDU, and Oberon networking are forward-compatible.

Rubin R100 NVL72Launch
2026
Rubin Ultra NVL576Upgrade
2027
Feynman F100Future
2028+
800VDC, CDU, and Oberon networking are forward-compatible across all generations.

Ready to Scale Your AI?

Limited Phase 1 capacity — 8 racks available. Reserve now to lock in anchor pricing.